As promised I have been continuing with work on the bridge, it is one of those projects that takes a fair bit of time and a lot of repetitious work with the various parts on the bridge structure. You have have to go head down and plough on. Part way through the project I was wondering two things - why did I pick this bridge to model and why did VR make it so long and big? But looking at my progress so far I am pleased that I have tackled this project. The finished bridge will be around 2 metres long this being done in O scale.
Before I decided to go ahead with the build there was a fair bit or research required. An almost essential requirement is a set of plans. An impossible task to go over the real bridge with a measuring tape to draw up plans and why build it if it was only going to be a 'close enough' build.
Through a forum I was able to get a set of plans for the bridge, even though they were unreadable they were a good guide and once a measurement was determined the rest could be scaled from that. The bridge is over 100 years old and I hope my build won't take that long to finish.
The previous bridge blog entry detailed one of the standout features of the bridge that being the concrete piers. These were beautifully made by 3D printing by Roger Johnson and I am in extreme debt to him for making such an accurate model.
What sits on these piers in the middle is a truss section. (pardon me if I don't describe all these parts properly) I had made a drawing up in CorelDraw that was traced over the original and printed off.
Laser cut beams with styrene rod spacers |
Approximate position on pier |
Nothing fancy this is where the bridge is made - my current workbench |
Close up of detail to be modelled |
The fun began when on the only drill I had, the chuck would not tighten around the fine drills required. I tried a pin vice but this didn't seem to work, it was slow and the tip tended to wander ending up with a second rate job with holes that didn't line up.
So after some research and deciding life is too short to scrimp and save, I headed off to Bunnings Hardware and purchased a Dremel drill and a drill stand. Initial outlay seemed a fair bit but when I got to use it, it made the job so easy. Even if it never drills another set of holes in its lifetime, it has done well with the bridge. Most of the 40 holes were done by eye and even allowing for the fact that I wear glasses, I was happy with the end result.
What I did was to glue two side pieces together and then drill through the two pieces. Then one piece was matched up another piece that sat behind the front piece. This then allowed a piece of styrene rod to go through the front section and sit on the back section of the truss. I wasn't worried that the rod didn't go through the back section as it would not be visible and I thought this was the best way to do it.
The middle bits |
With the inside bits done, then comes the outside bits |
Now the outside bits |
One side down, one side to go. |
Sitting on top of the finished piers |
Top and bottom
plates were also added, this made the truss look complete and solid.
Once the second truss was completed then the undercoat primer can be
applied.
I bought a can of Tamiya primer and two cans of Tamiya grey for the final coat. One of the greys had a blueish tinge, so I tried at least another two various shades of grey before I was happy with the colour. This results in a 'near new' finish that will need to be weathered down and a hint of rust colour applied. You can see on the above photo that I needed to have a portion of the aluminium channel removed to allow for the truss to fit up closer to the bridge deck. This was done on Russell Freemans milling machine and a perfect job was produced.
The whole bridge build is a constant juggling of trying to make available material fit and do the job. You hope the end result will end up looking like the real thing. I don't have the tools or skills to do an 'exact' model.
The next job was to make eight "I" channel pieces that fit across the top of the truss. They had to be custom made as there was no applicable Evergreen stryrene shapes. Again they are not perfect but most of them will be hidden by the deck. They were glued to the top of the two side trusses. Another aspect of this bridge is that it is not a straight on bridge, rather the trusses are offset/skewed at an angle along with the piers, but so far so good.
The eight I channels in place. |
In the photo above you can see that the truss slides into the adjoining bridge section. This is why there was so much pre planning done to make sure it all worked as the build went on. Once the eight channel pieces were glued to the two trusses the structure became more solid. There are further cross bracing pieces required, but I will have to go back to the plan and try decipher what is required. All my photos of the real bridge were taken from the Thomson station side and not possible to get shots showing the cross supports. These won't be visible from the normal viewing level and only when looking up from underneath, so I am not fussed if they are not 100% correct, as long as it holds together.
An upside shot of how the pieces all fit together |
Another part of the bridge done |
Well that's where the bridge build is up to at the moment, I think the centre truss was the hardest part of the build so far and consumed quite a few hours to finish. It will all come together one day, so at the moment I am polishing up on how to create rivers on Youtube.