Dairy ProgressSlowly but surely the dairy situated at the back of Kameruka platform is taking place. The bulk of the building is built, the roof is on and there are now actually three posts to support it.
To the casual visitor who doesn't know what the building is for, the cream colour of the building, three milk churns and a guy dressed in white overalls should help. (He would certainly not work at the oil siding next door in white clothing) All that is missing from the building are some roof vents which are on their way from Walthers in the USA. At least Hurricane Irene is blowing the plane in the right direction so it might get here quicker. As soon as the vents are placed on the roof I will do another report on the building rather than this skimmed down version.